Weilai (Guangzhou) Environmental Protection Equipment Co., Ltd.

TEL: +86 18320188145 丨 Whatsapp:+86 13909754659

NAVIGATION

CORRELATION

CONTACTS

Weilai (Guangzhou) Environmental Protection Equipment Co., Ltd.

EMAIL:weilaihbsb@163.com / kelseyluweilai@gmail.com
TEL:+86 18320188145 丨 Whatsapp:+86 13909754659
mobile phone:
WhatsApp:+86 13909754659
WEB:http://www.kdnnypump.com

News

Current Location:HOME > News >

The Assembly Method Of Impeller For Self-Priming Pump

TIME:2024-06-24 Author:admin Views:

Acid and alkali resistant self-priming pump is a kind of pump equipment commonly used in industrial field, and the installation method of its impeller is very important.The correct installation of the impeller can ensure the normal operation of the pump, improve the work efficiency and service life. The installation method of acid and alkali resistant self-priming pump impeller will be described in detail below.
 
1. Before installing the impeller, prepare installation tools and devices, such as nut wrenches, rubber mallets, and measurement tools. At the same time, it is necessary to carefully read the installation instructions of the product to understand the specific details of the installation of the impeller.

2. Determine the steering of the impeller. Under normal circumstances, the impeller has an arrow indicating the direction of rotation. When installing, it is necessary to ensure that the impeller steering is consistent with the rotation direction of the pump, so as to ensure the normal operation of the acid and alkali resistant pump.
 
3. Clean the inlet and outlet of the pump. The use of brush or water flushing, the import and export impurities are completely removed to prevent impurities on the normal operation of the impeller.
 
4. Install the impeller for the acid and alkali-resistant self-priming pump. Insert the impeller gently into the inner cavity of the pump, ensuring that the impeller is aligned with the axis of the pump. The impeller can be rotated appropriately during installation so that it is easily aligned with the shaft.
 
5. Install nuts and gaskets. According to the requirements of the product manual, select the appropriate nuts and gaskets for installation. Use the nut wrench to gradually tighten the nut, but do not exert excessive force to avoid damaging the impeller or pump body.
 
6. Irrigation test run. After installing the impeller, add the appropriate amount of lubricating medium or water first, and then start the pump for trial operation. Observe the operation of the pump and check whether there is any abnormal situation such as water leakage or abnormal sound. If a problem is found, stop the operation in time for troubleshooting.
 
7. Perform a final inspection. After the completion of installation and trial operation, the installation quality of the impeller is finally checked. Check whether the impeller is aligned with the pump shaft, whether the nut is tightened, and whether the rotation of the impeller is flexible and whether there are problems such as sticking resistance. Through the above installation steps, we can ensure the correct installation of the acid and alkali resistant self-priming pump impeller. Only the correct installation of the impeller can ensure the normal operation and work efficiency of the pump.
 
During the installation process, pay attention to carefully read the product instructions and operate in strict accordance with the requirements to ensure safety and reliability. At the same time, after the installation of the impeller, it is also necessary to conduct trial operation and final inspection to eliminate potential problems and improve the service life and performance of the equipment.

-THE END-
Weilai (Guangzhou) Environmental Protection Equipment Co., Ltd. © 粤ICP备18133839号